Electrode band kind brake
CZPT arc furnace parts
Furnace working conditions:
1 Atmosphere
The altitude is less than 1500m
Environment temperature: -20-45 centi degrees
Monthly average maximum humidity is less than 90% during rainy season
No electric dust, detonating gas and aggressive gas
No obvious vibration and shaking.
2 Power supply
High tension AC 35KV± 10%
Low tension AC 380/220V± 10%
Frequency 50Hz± 2%
Control voltage AC 220V
Electromagnetic valve DC 24V
3. EAF-30T main technical parameters
Steel-making DC arc furnaces are used for melting quality carbon and alloy steel, their normal capacities are
from 3t to 100t.
Features:
OP, HP and UHP power input models are CZPT. Both right and left operations for your choice. Roof swinging
and top charging. Advanced designs of the furnace ensure operation reliable and performance excellent.
Descriptions:
Furnace body –tapping manners: Spout and EBT tubular water-cooled and traditional roof are CZPT.
Tilting mechanism.
Electrode lifting mechanism
It can be realized by bogie movement or mast lifting, common copper tube arm or advanced water-cooled
conducting arm are CZPT.
Roof lifting and swinging mechanism. Integarted or separated foundation designs for your choice.
Cooling water monitoring and alarming system.
CZPT station and control valves system.
CZPT control system: Automatic regulator of electrode lifting can be VVVF controlled or computer controlled,
the later can equipped with CRT displayer. The acting of all parts and interlocks is controlled by PLC.
Most advanced technologies of steelmaking furnace can be provided as requested:
Single-electrode D. C powering technology
50% less electrode consumption
50% less electric energy con sumption
Less flicker and distrubance on power network
More uniform heating of liquid steel
Electromagnetic strirring of liquid steel.
Copper steel composite conductive electrode arm
Tubular water-cooled wall
Tubular water-cooled roof
Eccentric bottom tapping (EBT)
Microcomputer controller-motor type electrode regulator
VVVF-Motor type electrode regulator
Energy-saving high current circuit
Large section water-cooled cable
Oxv-fuel burnel systems
Manipulators with water cooled lances for blowing oxygen and carbon
CZPT Patameters:
Design | Rated potential | maximum faucet excess weight | furnace shell inner diameter (mm) | transformer potential KVA | Electrode diameter mm |
electrode lifting reducing speed m/min | base electrode product | electrode regulator design | rectifier design |
VLHXZ-3 | 3 | 5 | 2500 | 2500 | 250 | 3/2.5 | |||
VLHXZ-5 | 5 | 10 | 3000 | 4000 | 300 | 3.five/2.five | |||
VLHXZ-10 | 10 | 15 | 3500 | 6300 | 350 | 4/three | |||
VLHXZ-twenty | 20 | 25 | 4000 | 12500 | 400 | 5/3.five | |||
VLHXZ-30 | 30 | 40 | 4200 | 16000 25000 | 450 500 | 6/4 | |||
VLHXZ-forty | 40 | 50 | 4600 | 20000 25000 31500 | 450 five hundred | 6/four | |||
VLHXZ-50 | 50 | 60 | 5000 | 25000 31500 40000 | 500 550 | 6/4 | |||
VLHXZ-60 | 60 | 75 | 5400 | 31500 40000 50000 | 550 | 6/four | |||
VLHXZ-eighty | 80 | 100 | 5800 | 40000 50000 63000 | 600 | 6/four | |||
VLHXZ-100 | 100 | 125 |
Our Best Service For You
1. | Pre sale services |
a. | make technological solution |
b. | send out quotation, complex knowledge sheet and drawing |
c. | get ready electricity transmission prepare, screening program and cargo prepare |
two. | In sale service |
a. | supervise the manufacturing timetable totally in accordance with the program |
b. | send out photographs to client throughout each manufacturing process(keep level) |
c. | tell the client one particular 7 days before screening. |
three. | Right after sale support |
a. | installation and commissioning, instruction the workers |
b. | quick reaction inside of 12 hrs any time |
c. | offer 12 months ensure interval generally. |
FAQ For You
one. Q: | What is your supply time ? |
A: | Rely on the sort of transformer. |
2. Q: | What is your payment time period? |
A: | thirty% progress by T/T , 70% ahead of delivery by T/T or L/C or we can examine about it. |
3. Q: | What variety of standard you comply with? |
A: | IEC, ANSI, CSA, GB, and so on |
four. Q: | What variety of supporting documentation you can give normally |
A: | Quotation, outline drawing, manufacturing strategy, high quality control strategy testing prepare, monetary report, variety examination report(KEMA, CESI),reference checklist, and many others |
five. Q: | What is your regular warranty period of time? |
A: | twelve months right after transformer procedure. |
six. Q: | Can u do installation and commission in user’s website? |
A: | Of course, we can deliver our installation team to user’s nation for service. |
7. Q: | Do you have any knowledge in this variety of transformer? |
A: | Indeed, we can provide reference list for check. |
Our rewards:
Top quality Assurance
–From the very beginning, VILLE ensures high quality in each stage to attain the best quality.
Experience Sharing
–With more than thirty years’ knowledge in electricity market, VILLE brings you an optimized resolution.
CZPT Support
–Anywhere you are, VILLE international network will support and supply you with price.
Quick Reaction
–In reaction to your requirements CZPT hold off, VILLE knows the worth of your time.
Thanks for picking VILLE as your reliable spouse and
make sure you believe in the two of us will generate a outstanding long term!