CZPT Description
Product | Unit | EK3-6E2-H |
Function Station | station | 6 |
Clamping Drive | ton | one hundred eighty |
Mold Plate Size | mm | (290*550)*2 |
Mold Height | mm | one hundred-230 |
Mold-opening Stroke | mm | 350 |
Injection Technique | ||
Injector | two | |
Diameter of Screw | mm | Φ65 |
Injection Cap(Max) | cm³ | 995 |
Injection Force | kg/cm² | -130 |
Injection Speed | cm/sec | -10 |
Rotating Pace of Screw | r.p.m | -190 |
Temperature Manage | section | 4 |
CZPTity Use | ||
Heater Barrel | kw | nine.eight*two |
Heating Plate | kw | seventy six.8 |
CZPT System | kw | fifty one.nine |
Vacuum Pump | hp | 1.five |
Cooling Admirer of Barrel | hp | one |
Total CZPTity | kw | 148.3 |
Oil Tank Size | L | a thousand |
Device Bodyweight | kg | 26000 |
Machine Dimension | mm | 8000*4500*3000 |
In depth Description :
Its every day efficiency is two*eighteen*8*24=6912 pairs by concept calculation.for one pair in 1 mould,For 2pairs in one mould is 6912*2=13824 pairs per 24hours
Notice:
1.Its merchandise selection consists of EVA mid-soles,rainboots,slippers,sandals, clogs,sport protectors and numerous kinds of sneakers and shoe accessories and relies upon on the EVA shoe mould.
2.The clamping pressure can be increased from one hundred fifty to 210 tons, in accordance to your necessity.
3.The foam EVA injection molding machine is entirely hydraulic and automated operation besides getting out merchandise.
4.It is PLC managed, its humanized parameter pc operation interface provide fast and actual conditions of production.
Character:
one.Lower operation height,Procedure height in accord with human engineering
two.Extra peak opening stroke
Act by set opening stroke: 350mm, which is not affected by any mould thickness alterations and
three.CZPT for 2plates mould,Mould thickness changing mechanism
Mould altering scope: 100-200MM
four.Rapid mould opening ,Act by toggle system which opens the mould speedily
five.Fast injector movement
Driven by linear-observe, making it possible for fast moving and exact positioning,Power saving style
6.No require h2o circulation for mould station
seven.CZPT preserving layout,Set oil tank with each other with injection base, which makes the composition compact and will save a lot more area.
Time period:
All quotations are CZPT price-additional tax.
Shipping date:Within 60 days Soon after acquiring the 30% earnest money
Payment expression: Advance payment at order 30%, 70% prior to shipment
Shipping and delivery Point out: Machines were taken apart and packed in ideal package that matches container shipping
For the equipment experiment and set up, our technician will be despatched to your
manufacturing unit. And you are requested to manage the cost of their journey and payment .
Also Our technician will manage all the machine factors for you and at the same time teach your workers on how to use and sustain the device.
Assure Time: One-12 months guarantee and lifelong services. During ensure period of time, the value of any spare parts or new accessory should be borne by the vendor, and the freight for shipping of spare areas will be on the buyer’s account.